Prevent the pour from sticking to the formwork and improve the setting and durability of concrete and mortars.

Formwork clamps Panalex
Key features
- Fecea527z70
- Fecea559n90
- Fecea124z38
- Fecea126z60
- Fecea336z65
- Fece128z80
What it is
Formwork clamps Panalex. Key specifications: fecea527z 70, fecea559n 90, fecea124z 38.
The formwork clamp is an element that connects and keeps two adjacent panels aligned, by clamping their frames.
What it is for
Used for building formwork for concrete pours and for pouring concrete, from formwork to vibration.
How to use it
Position it over the joint between the frames and tighten it with the lever or the wedge until the edges meet, checking the alignment. After use, clean off mortar residues and lubricate.
Where it is used
- Industrial construction
- Residential construction
- Civil engineering
Technical data
- Fecea527z: 70
- Fecea559n: 90
- Fecea124z: 38
- Fecea126z: 60
- Fecea336z: 65
- Fece128z: 80
- Fecea121z: 100
- Fecea322z: 110
- Fecea133z: 120
- Fecea325z: 130
- Fecea346z: 120
- Fecea142z: 27
- Fecea166z: 40
- Fecea104z: 50
Who it is for
Designed for formwork carpenters, concrete workers and steel fixers.
Related products
- Formwork system (shaped concrete) Panalex
- Semicircular element for PANAWALL formwork Panalex
- Formwork release agent Alchioil 400 Proind — from the category Release Agents and Admixtures for Concrete and Mortar
- Flexible poker for vibrator Ø 32 mm 1.7 m Makita 1910E2-3 — from the category Concrete Vibrators
- PANAPUNT props Panalex — from the category Heavy-Duty Telescopic Props
- Browse the whole category: Steel-Frame Formwork
Before you order
Tell us the quantities you need and the intended use: if there is a more suitable version, or an equivalent available sooner, we will let you know.
For prices and availability, request a quote from AMES Srl: we will reply with our quotation, delivery times and, where needed, an equivalent technical alternative.
Specifications 53
| Fecea527z | 70 |
|---|---|
| Fecea559n | 90 |
| Fecea124z | 38 |
| Fecea126z | 60 |
| Fecea336z | 65 |
| Fece128z | 80 |
| Fecea121z | 100 |
| Fecea322z | 110 |
| Fecea133z | 120 |
| Fecea325z | 130 |
| Fecea346z | 120 |
| Fecea142z | 27 |
| Fecea166z | 40 |
| Fecea104z | 50 |
| Fecea101z | 25 |
| Fecea183n, not galvanised | 25 |
| Fecea183z, galvanised | 25 |
| Fecea157ns | 112 |
| Fecearp | 40 |
| Fecea105n, not galvanised | 50 |
| Fecea107n, not galvanised | 70 |
| Fecea105z, galvanised | 50 |
| Fecea107z, galvanised | 70 |
| Fecea159n, not galvanised | 90 |
| Fecea159z, galvanised | 90 |
| Fecea530n | 300 |
| Fecea500 | 100 |
| Fecea1535t | 125 |
| Fecea550n | 1,15 |
| Feceabl550n | 230 |
| Fecea195z | 20 |
| Feceb2s600n | 6.000 |
| Feceb2s600z | 6.000 |
| Fecea224z | 36 |
| Fecea438z | 80 |
| Fecea425z | 130 |
| Fecea447z | 130 |
| Fecea269z | 15 |
| Fecea204z | 65 |
| Fecea256n, not galvanised | 140 |
| Fecea256z, galvanised | 140 |
| Feceb6l600n | 6.000 |
| Fecea624z | 43 |
| Fecea240n | 80 |
| Fecea369n | 15 |
| Fecea265n | 150 |
| Feceg600g | 20 |
| Feceg610g | 20 |
| Feceg650z | 20 |
| Feceg605z | 20 |
| Feceg615z | 20 |
| Feceg660n | 30 |
| Feceg695pv | 0,565 |
The perfect setup for this job
Everything you need in one place, from functionality to safety.
For the job
Support floors, formwork and beams during the pour and until striking, adjustable in height.
Compact fresh concrete in the formwork, expelling the air.
Connect the load to the crane or hoist hook without damaging its surface.




