Pump out and transfer dirty water containing light sludge, suspended solids and wastewater.

Chlorination inspection chamber Rototec
Key features
- MaterialOne-piece LLDPE, PVC spigots and internal T-piece, PP screw cap
- ConnectionDN 110 (DN 125 on request)
- CapCC300
- ModelPCL50 (Ø 430 mm, H 430 mm), PCL150 (Ø 580 mm, H 660 mm)
- Usedisinfection with chlorine tablets downstream of treatment plants
What it is
The chlorination chamber is an LLDPE chamber with an internal T-piece for chlorine tablets, installed downstream of a treatment plant for the final disinfection of the effluent before it is discharged into the receiving water body; access via the Ø 355 mm inspection opening for refilling/maintenance. One-piece LLDPE structure with PVC inlet/outlet stubs, internal PVC T-piece and PP screw cap; standard DN 110 (DN 125 on request); items PCL50 and PCL150 with dimensions and Ø, H, HE, HU measurements as per the technical data sheet. Additional features: "Inside there is a housing for a chlorine tablet. When installed downstream of a treatment system, it therefore allows the treated effluent to be disinfected before it is discharged into the receiving water body."
The inspection chamber is a prefabricated chamber, usually plastic and buried, inserted along the drain line to inspect, sample, separate or treat the water, each type having a specific function.
What it is for
Used for filtering system water and in the installation and maintenance of plumbing systems.
How to use it
Bury it on a levelled bedding, connecting the upstream and downstream pipes in the direction of flow and respecting the gradients. Bring the cover up to ground level and keep it accessible. Inspect and clean it at regular intervals, according to its function.
Where it is used
- Building services
- Water engineering works
Technical data
- Material: One-piece LLDPE, PVC spigots and internal T-piece, PP screw cap
- Connection: DN 110 (DN 125 on request)
- Cap: CC300
- Model: PCL50 (Ø 430 mm, H 430 mm), PCL150 (Ø 580 mm, H 660 mm)
- Use: disinfection with chlorine tablets downstream of treatment plants
Who it is for
Designed for plumbers.
Related products
- Water meter inspection chamber Rototec
- Non-return inspection chamber Rototec
- Round inspection chamber with tap — from the category Inspection Chambers
- Submersible pump for heavily soiled water SVS-VA Wortex — from the category Submersible Wastewater Pumps
- 1P+N RCBO (RCD/MCB combi), Friggeri FR-MD1N25/30 — from the category Distribution Boards and Protection Devices
- Browse the whole category: Water Purification
Before you order
In your request, please state the connection type and the quantities required, so we can give you the right quotation first time.
For prices and availability, request a quote from AMES Srl: we will reply with our quotation, delivery times and, where needed, an equivalent technical alternative.
Specifications 5
| Material | One-piece LLDPE, PVC spigots and internal T-piece, PP screw cap |
|---|---|
| Connection | DN 110 (DN 125 on request) |
| Cap | CC300 |
| Model | PCL50 (Ø 430 mm, H 430 mm), PCL150 (Ø 580 mm, H 660 mm) |
| Use | disinfection with chlorine tablets downstream of treatment plants |
Technical documents
Manufacturer documents (PDF, opens in a new tab).
The perfect setup for this job
Everything you need in one place, from functionality to safety.
For the job
Pump out muddy water with sand and debris from excavations, sumps and flooded rooms.
Eliminate or mask bad odours from portable toilets, waste, drains and rooms.
Distribute power on site and protect people and tools from overloads and earth leakage.
For safety
Protect hands from cuts, impacts, heat, cold and chemicals.